Based on structural design, participants must construct a structure using the provided materials. The challenge is to build a bridge that meets the given specifications while demonstrating creativity, stability, and aesthetic appeal.
Date : 07-03-2025
Time : 10:30 AM - 1:30 PM
D6 - 205
Bridge Specifications:
Structure Requirements: The bridge must include a flat surface, proper supports, and use a minimum number of ice cream sticks. A total of 300 sticks will be provided.
Materials: Ice cream sticks, Glue
Judging Criteria:
Time Limit: 1 hour
Coordinators:
Jinal Patel - 8780776449
Samir Vasava - 9537178044